STONEHENGE METALS LIMITED
ABN 81 119 267 391
ANNUAL REPORT
FOR THE YEAR ENDED 30 JUNE 2015
STONEHENGE METALS LIMITED
1
CORPORATE DIRECTORY
Directors
Brendan Hammond
Bruce Lane
Bevan Tarratt
Young Yu
Non-Executive Chairman
Managing Director
Non-Executive Director
Non-Executive Director
Company Secretary
Mathew Foy
Registered Office
Office J, Level 2
1139 Hay Street
West Perth WA 6005
Principal Office
Level 3, 89 St Georges Terrace
Perth WA 6000
Telephone:
+61 8 9481 2277
Facsimile:
+61 8 9481 2355
Email:
admin@stonehengemetals.com.au
Web:
www.stonehengemetals.com.au
Stock Exchange Listing
Australian Securities Exchange
ASX Code - SHE
Share Registry
Link Market Services Limited
Central Park
Level 4, 152 St Georges Terrace
Perth WA 6000
Telephone:
1300 554 474
Bankers
National Australia Bank Limited
50 St Georges Terrace
Perth WA 6000
Auditor
BDO Audit (WA) Pty Ltd
38 Station Street
Subiaco WA 6008
CONTENTS
Chairman’s Letter
Page
3
Business Review
4
Directors’ Report
9
Auditor’s Independence Declaration
23
Consolidated Statement of Profit or Loss and Other Comprehensive Income
24
Consolidated Statement of Financial Position
25
Consolidated Statement of Changes in Equity
26
Consolidated Statement of Cash Flows
27
Notes to the Consolidated Financial Statements
28
Directors’ Declaration
56
Independent Auditor’s Report to the members
57
Additional information
59
STONEHENGE METALS LIMITED
2
CHAIRMAN’S LETTER
Dear Shareholders,
On behalf of the Board of Directors, it is my pleasure to present the 2015 Annual Report to Shareholders of
Stonehenge Metals Limited.
2015 has been a year of significant change for Stonehenge Metals Limited, following the exercise of the option
to acquire Protean Energy Australia Pty Ltd, which enables the Company to acquire the Protean wave energy
conversion (WEC) technology. In order to effectuate this acquisition, Stonehenge must complete a change in
the Company’s nature and scale of activities under Chapter 11 of the ASX Listing Rules. The Company is
currently progressing a notice of meeting for shareholders to approve and effect this change.
During the period, functional ocean based testing of the fully assembled ProteanTM WEC device was
successfully completed. The testing demonstrated that the ProteanTM WEC functioned as anticipated and that
it was responsive to wave motion even in very low wave height conditions. Preparations for fabrication of the
30 ProteanTM WEC buoys which make up the planned pre-commercial demonstration wave farm have now
commenced. Following this testing, the Company has been able to progress discussions for the potential to
test a ProteanTM WEC wave farm in Bunbury, Western Australia and to install a commercial pilot wave farm
project for Hanimaadhoo Island in the Maldives.
The Company progressed its Korean interests during the year by securing KOSDAQ listed Korea Resources
Investment & Development Inc. (KORID) as a joint venture partner. The JV, completed in July 2015, will
cements a strong working relationship between KORID and Stonehenge to initially focus on:
securing a collaboration agreement to test the relevant sections from within the 36,000 metres of
mineralised historical drill core (from Stonehenge’s Daejon Project area) stored at the Korean Institute
of Geoscience and Mineral Resources;
significantly upgrading the current Daejon Project resource estimates in size and or confidence;
preparing a pre-feasibility study for the Daejon Project; and
preparing work programs and budgets to support completion of a definitive or bankable feasibility study
for the Daejon Project.
Stonehenge’s activities in 2015 have set the Company up for a very exciting year in 2016 with plans to
commence a wave farm pilot program in order to progress the commercialisation of the ProteanTM technology
and also to further develop its uranium and vanadium assets in Korea.
I would like to thank members of the Board, senior management and all our staff and contractors for their
hard work and contributions in what has been both a successful and challenging period. On behalf of the
Board and Company, I would like to thank you, our shareholders, for your ongoing support. The future remains
exciting for Stonehenge and we look forward to increasing shareholder value over the next 12 months and
beyond.
Yours faithfully
Mr Brendan Hammond
Non-Executive Chairman
STONEHENGE METALS LIMITED
3
BUSINESS REVIEW
Stonehenge Metals Limited (ASX:SHE) (Stonehenge or the Company) is pleased to provide Shareholders with a review of
operations for the financial year ended 30 June 2015.
HIGHLIGHTS
Agreements signed with San Marino Venture Group (SMVG) and Yanchep Beach Joint Venture (YBJV) to provide
support and progress the commercialisation of the Protean™ wave energy convertor (WEC) technology, including
the potential development of a Protean™ WEC wave farm off the coast of Western Australia.
Memorandum of Understanding signed with Cal Poly, California’s leading Polytechnic University, to facilitate joint
applications for funding opportunities offered by the US Department of Energy.
Structural component build, assembly and workshop testing of a single Protean™ WEC completed.
Progression to complete the sale of 50% of Stonehenge Korea Ltd to Korea Resources Investment & Development
Inc. (KORID) to create a joint venture to progress its uranium and vanadium interests.
Mr William Toman engaged as President of Protean Wave Energy Inc.
Ocean based wet testing of a single Protean™ WEC successfully completed.
Two key appointments made with Mr Brendan Hammond appointed as Chairman of the Board and Mr Scott Davis as
advisor to the Company, both industry veterans bringing significant experience and expertise.
KOREA
Stonehenge is developing a world-class uranium and vanadium project in South Korea via its 50% holding in Stonehenge
Korea Ltd. The flagship Daejon Project boasts Inferred & Indicated uranium Resources of 66.7Mlbs grading 320ppm
U3O8 and Inferred & Indicated vanadium Resources of 17Mlbs grading at 3,200ppm V2O5 (in accordance with JORC
guidelines). Daejon is one of three (including Miwon and Gwesan) projects Stonehenge holds in Korea and, in addition
to its existing resources, offers significant exploration potential with conceptual exploration targets of 17Mlbs to 39Mlbs
grading 300 to 500ppm U3O8 and 385Mlbs to 695Mlbs grading 2,500 to 3,500ppm V2O5.
Company activities
On 18 February 2015, the Company advised it executed formal joint venture (JV) documentation with Korean Stock
Exchange (KOSDAQ) listed Korea Resources Investment & Development Inc. (KORID). The JV, created via the sale to
KORID of 50% of Stonehenge Korea Ltd, cements the working relationship between KORID and Stonehenge. The JV will
initially focus on accelerating development of the Daejon vanadium and uranium project by conducting work to
contribute to the preparation of a pre-feasibility study.
The JV with KORID will focus on:
securing a collaboration agreement to test the relevant sections from within the 36,000 metres of mineralised
historical drill core (from Stonehenge’s Daejon Project area) stored at the KIGAM;
significantly upgrading the current Daejon Project resource estimates in size and or confidence;
preparing a pre-feasibility study for the Daejon Project; and
preparing work programs and budgets to support completion of a definitive or bankable feasibility study for the
Daejon Project.
Since year-end, the Company advised the completion of the sale of 50% of Stonehenge Korea Limited to KORID.
Stonehenge and KORID now hold 50% each of Stonehenge Korea. In consideration for the sale, Stonehenge received
4,643,497 KORID shares. The KORID shares are listed on KOSDAQ and are escrowed for 12 months. The shares can be
sold to fund the activities of the JV after 13 months if KORID does not exercise its right to withdraw from the JV, as per
the transaction terms advised to ASX on 24 December 2014.
Mineral Resources
On 29 August 2013, the Company advised a maiden vanadium resource and an upgrade to the existing uranium resource
at the Daejon Project. The Chubu deposit resource was prepared by independent mining consultants, Optiro, by
incorporating the five holes drilled in 2013 and adjusting the geological interpretation accordingly. Statistical analysis of
the data was undertaken and a top-cut of 9,000ppm was applied to the V2O5 data. All the 2013 data is based on chemical
assay for both U3O8 and V2O5, while the historic data is based on gamma-ray probe data.
STONEHENGE METALS LIMITED
4
BUSINESS REVIEW
The overall uranium resource is set out below:
Daejon U3O8 Resource (2004) Estimate at a 200ppm cut-off
Tonnes
Grade
Metal
Mt
U3O8 ppm
Mlbs
Inferred
46
330
34
Indicated
3.3
247
1.8
Yokwang
Inferred
39
310
26
Kolnami
Inferred
7
340
5
95.3
320
66.8
Prospect
Classification
Chubu
Total
This information was prepared and first disclosed under the JORC Code 2004. It has not been updated since to comply
with the JORC Code 2012 on the basis that the information has not materially changed since it was last reported.
A maiden uranium resource was announced for the Daejon Project containing 17.3Mlbs V 2O5:
V2O5 Resource Estimate at a 2,000ppm cut-off (JORC 2012)
Tonnage
Grade
Metal
Mt
ppm
Mlbs
Indicated
2.3
3,208
16.5
Inferred
0.1
2,788
0.8
Total
2.4
3,186
17.3
Year
Category
2013*
2013*
Governance Arrangements and Internal Controls
The Company has ensured that the mineral resource estimates quoted above are subject to governance arrangements
and internal controls. A summary of these are outlined below.
The report of mineral resources is grouped by development properties and includes both uranium and vanadium
deposits. The uranium mineral resources at the Chubu, Kolnami and Yokwang prospects are reported in accordance with
JORC 2004 and these will be progressively updated to the JORC 2012 standard as development priorities dictate.
The maiden vanadium resource reported at the Chubu Prospect has been reported in accordance with JORC 2004 and
this will be progressively updated to the JORC 2012 standard as development priorities dictate.
Audit of the estimation of mineral resources is addressed as part of the annual internal audit plan approved by the Board
in its capacity as the Audit and Risk Committee. Specific audit of the mineral resources was performed in 2013 and this
audit was managed by Stonehenge and its external technical experts.
In addition to routine internal audit, the Board monitors the mineral resource status and approves the final outcome. The
annual mineral resource update is a prescribed activity within the annual corporate planning calendar that includes a
schedule of regular executive engagement meetings to approve assumptions and guide the overall process.
The mineral resource estimation processes followed internally are well established and are subject to systematic internal
and external peer review. Independent technical reviews and audits are undertaken on an as-needs basis as a product of
risk assessment.
Competent Person Statement
The information contained in this report that relates to Mineral Resources and exploration results is based on information compiled by Mr. Ian Glacken
of Optiro Pty Ltd (ABN 63 131 922 739), which provides geological consulting services to Stonehenge Metals Limited. Mr. Glacken is a Member of The
Australasian Institute of Mining and Metallurgy and has sufficient experience which is relevant to the style of mineralisation and type of deposit under
consideration and to the activity which he is undertaking to qualify as Competent Person as defined in the 2012 Edition of the “Australasian Code for
Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Mr Glacken consents to the inclusion in this report of the matters based on his
information in the form and context in which it appears.
STONEHENGE METALS LIMITED
5
BUSINESS REVIEW
PROTEAN™ WAVE TECHNOLOGY
The Protean™ wave energy converter (WEC) system is based upon an internationally patented and patent pending
intellectual property invented by Sean Moore. The Protean™ WEC technology has been identified as having a number of
potential advantages over other wave energy technologies currently being investigated internationally.
The Protean™ WEC system is based upon a point-absorber wave energy converter buoy device which floats at the ocean
surface and extracts energy from waves by the extension and retraction of a tether to its anchoring weight on the sea
bed. The device is unique in that it optimises the conversion of energy from waves through all six available directional
wave forces (being: heave (up-down), surge (back-and-forth), sway (side-to-side), yaw, pitch and roll). Other wave energy
systems typically use one or two degrees of movement, which can significantly reduce their productivity. Protean™ is
based on globally accepted and proven ocean buoy technology and is designed to withstand the harsh ocean
environment; a critical issue for wave energy conversion systems. Major design benefits of the system may include:
Scalability – the Protean™ WEC system is designed to provide low cost energy for a wide range of applications, from
small to large scale production.
Versatility – the Protean™ WEC system has been designed for dedicated or simultaneous production of electricity or
the desalination of seawater.
Affordability – the Protean™ WEC system was designed from the ground up to provide cost effective, consistent and
reliable renewable energy in lower and higher energy wave resource locations. The Protean™ WEC is designed for
cost effective manufacture, deployment and maintenance.
The Protean™ WEC design has been trialled at a 1.5 kW scale in the ocean off Perth, proving the system can successfully
convert the power from waves into usable energy. The design is based upon a compact architecture which targets power
production from a small, low cost design aimed at keeping the projected levelised cost of energy down.
The Protean™ WEC has been developed to use compact architecture to produce power from a small, low cost, scalable
design targeted at keeping the projected cost of energy down. The Protean™ WEC has been designed to be cost
competitive to manufacture, deploy and maintain. The future plans for the Protean™ WEC include the deployment of a
pre-commercial demonstration of a scalable power array (wave farm) prior to moving the technology into early
commercialisation. The Stonehenge assessment program aims to:
refine the scale device to produce a suitable pre-commercial model;
create a scalable power array so as to provide the power requirements of a prospective customer;
test the demonstration wave farm for its potential to deliver cost effective power;
verify the results, including commissioning of an independent expert to qualify the testing results; and
commence commercialisation of the scalable array (wave farm) for small to medium customers.
Company Activities
Acquisition of Protean Energy Australia Pty Ltd
On 11 August 2014, the Company announced it had entered into a binding term sheet (Term Sheet) with Protean Energy
Pty Ltd (PEL) to acquire 100% of PEL’s wholly owned subsidiary, Protean Energy Australia Pty Ltd (PEA). PEA is a nontrading entity which holds the intellectual property titles, rights and licenses to the Protean™ wave energy converter
technology.
Subsequently on 10 November 2014, the Company entered into formal documents for the transaction, being the Call
Option and Licence Agreement, which superseded and replaced the Term Sheet.
On 11 August 2015, the Company exercised the option pursuant to the Call Option and Licence Agreement, and has
entered into the Share Purchase Agreement to acquire 100% of the shares in PEA (Acquisition).
As part of the Acquisition, the Company will seek the approval of shareholders to change its name to Protean Wave
Energy Limited. The Acquisition will result in a change in the Company’s nature and scale of activities, requiring
shareholder approval under Chapter 11 of the ASX Listing Rules and the Company will need to re-comply with Chapters
1 and 2 of the ASX Listing Rules. In order to re-comply with the ASX Listing Rules, the Company expects to seek
shareholder approval to, amongst other things, issue a re-compliance prospectus to raise sufficient funds to accelerate
STONEHENGE METALS LIMITED
6
BUSINESS REVIEW
commercialisation of the Protean™ WEC technology. A notice of meeting to seek approval for the above matters,
including the quantum of the capital raising, is expected to be dispatched shortly.
Engagement of San Marino Venture Group LLC
During the period, the Company engaged California-based San Marino Venture Group LLC (SMGV) to provide advisory
support for the commercialisation of the Protean™ wave energy convertor (WEC) technology in the US as part of the
Company’s global commercialisation strategy. SMVG has a highly experienced and skilled team and is expected to add
credibility and know-how to guide commercialise the Protean™ WEC technology in the US.
Memorandum of Understanding - California Polytechnic University at San Luis Obispo
On 30 June 2015, the Company announced the signing of a Memorandum of Understanding with California Polytechnic
University at San Luis Obispo (Cal Poly) to facilitate applications for major funding opportunities offered by the US
Department of Energy (DOE). The funding is to support the next phase of the Cal Wave initiative, which is one of a number
of projects created under the Institute for Advanced Technology and Public Policy (IATPP) at Cal Poly. The mission of the
IATPP is to develop and promote practical solutions to real word problems by informing and driving public policy. The
Cal Wave project is in place to assess the feasibility of siting the planned National Wave Energy Test Facility in California
and has to date been funded by the DOE through an initial $750,000 funding award. Stonehenge will serve as a
contributing WEC technology proponent on the next phase of the CalWave project (if the DOE funding application
succeeds), with the potential to be deployed into the facility in California.
Memorandum of Understanding with Yanchep Beach Joint Venture
The Company signed a Memorandum of Understanding (MOU) with Yanchep Beach Joint Venture (YBJV) during the
financial year for collaboration on the development of a Protean™ WEC wave farm off the coast of Western Australia to
potentially supply the community at Two Rocks. The MOU supports Stonehenge’s commercialisation strategy and will
initially begin with a single 1.5 kW buoy followed by a 30-buoy (45 kW) demonstration wave farm. The ultimate vision for
the project involves working with the community to develop an appropriate model to create a wave farm to supply energy
and/or water to the community.
YBJV is part of one of the largest metropolitan urban development projects in Australia, SunCity, at Yanchep in Perth’s
northern coastal transport corridor. YBJV believe that SunCity will emerge as possibly the only sustainable Clean Green
Community in a strategic regional city centre within a metropolitan area in Australia. The project has been given rightful
acknowledgement at national level through the Federal Government’s Major Project Facilitation status.
Appointment of Lead Energy Specialist, Mr William Toman
On 26 March 2015, the Company advised that Mr William Toman had been engaged as President of the Company’s US
subsidiary, Protean Wave Energy Inc. Mr Toman is an energy industry professional with more than 25 years of experience
managing energy and environmental project development. He has been responsible for the development of over 2,000
MW of generating capacity for utilities and independent power producers both inside and outside the US.
Mr Toman’s most recent engagement was at California Polytechnic University at San Luis Obispo (Cal Poly) where he led
a 12-month US Department of Energy funded study investigating siting, cost and feasibility issues for developing a
national wave energy testing centre offshore of California’s Central Coast. Whilst with California’s largest energy utility,
Pacific Gas and Electric Company, Mr Toman led development of the US’s first open ocean, grid-connected wave energy
testing and demonstration facility (Humboldt WaveConnect), a 5 MW project, through a Federal Energy Regulatory
Commission draft pilot license application in Humboldt County, California.
Mr Toman is a highly qualified nuclear engineer holding an M.S in Nuclear Engineering from the University of California
at Los Angeles (UCLA) and an M.S in Industrial Administration from the Tepper School of Business at Carnegie Mellon
University. He has a particular depth of expertise with large-scale commercialisation of renewable energy technologies.
He has extensive experience in the program management of siting and developing utility scale energy projects with
special concentration in marine and hydrokinetic renewable technologies such as ocean wave, tidal energy as well as
floating offshore wind energy.
STONEHENGE METALS LIMITED
7
BUSINESS REVIEW
Protean Detailed Design Completed
During the 2015 financial year, the Company advised that the detailed design of the Protean™ wave energy converter
had been completed. The detailed design was completed within schedule and within the budget; opening the way for
preparation of the fabrication of the first 1.5 kW device ahead of schedule.
The completion of this pre-manufacturing phase is an important milestone in the efforts of the Company to build a
commercial solution from the Protean™ technology platform. The Company aims to create an economically viable wave
energy converter to satisfy the global demand for cost effective renewable energy.
CORPORATE
Key Appointments
Mr Bruce Lane and Mr Sean Moore (the Protean™ WEC inventor) both commenced in their respective roles of
Managing Director and Chief Technology Officer (Wave Energy) during the financial year.
Mr Scott Davis was appointed during the period to advise the Company on its business development and
commercialisation activities. Mr Davis is an energy industry professional with significant experience in sales and
marketing and market reform roles in the electricity sector. Mr Davis has a particular depth of expertise in
electricity pricing and integration of renewable energy into isolated power systems.
Mr William Tomin was appointed as President of the Company’s US subsidiary, Protean Wave Energy Inc. Mr
Toman is an energy industry professional with more than 25 years of experience managing energy and
environmental project development.
In June 2015, the Company appointed Mr Brendan Hammond as Chairman of the Board effective 1 July 2015. Mr
Hammond has a wealth of experience within the resources, energy and infrastructure industries. Mr Richard
Henning resigned from the Board effective 1 July 2015.
Rights Issue
During the financial year, the Company completed an equity raising of $1,503,643 before costs, via a pro-rata nonrenounceable rights issue (Rights Issue). Eligible shareholders were provided the opportunity to subscribe for seven (7)
new fully paid ordinary shares in the Company for every ten (10) shares. New shares under the Rights Issue were offered
at $0.005 per share. Applications under the Rights Issue totalled $649,427 representing approximately 43% of all shares
offered.
Later in the period, CPS Capital, acting as Lead Manager, successfully placed the remaining 170,843,200 shortfall shares
at $0.005 to raise a further $854,216.
Conversion of Convertible Notes
During the period, the Company advised that it had arranged $120,000 of working capital funding via a convertible loan.
The loan, provided by parties including the Directors of Stonehenge, converted into fully paid ordinary shares following
shareholder approval, at a price of $0.004 being 80% of the Rights Issue price.
On 24 November 2014, the Company advised that the outstanding convertible loan notes had been converted into
30,000,000 ordinary shares following shareholder approval at a general meeting held on 11 November 2014.
STONEHENGE METALS LIMITED
8
DIRECTORS’ REPORT
Your Directors present the financial report for the consolidated entity, consisting of Stonehenge Metals Limited
(Stonehenge or Company) and the entities it controls (Consolidated Entity or Group) for the financial year ended 30 June
2015.
DIRECTORS
The names of Directors who held office during the year and up to the date of this report are:
Brendan Hammond
Non-Executive Chairman (appointed 1 July 2015)
Bruce Lane
Managing Director
Young Yu
Non-Executive Director
Bevan Tarratt
Non-Executive Director
Richard Henning
Non-Executive Chairman (resigned 1 July 2015)
PRINCIPAL ACTIVITIES
The activities of the Group and its subsidiaries during the financial year were mineral exploration in South Korea and
commercialisation activities associated with the Protean™ wave energy converter technology.
There were no significant changes in the nature of these activities during the year.
DIVIDENDS
No dividends have been declared, provided for or paid in respect of the financial year (30 June 2014: Nil).
FINANCIAL SUMMARY
The Group made a net loss after tax of $4,720,479 for the financial year ended 30 June 2015 (30 June 2014: loss
$1,482,055). At 30 June 2015, the Group had net assets of $5,133,571 (30 June 2014: $7,438,530) and cash assets of
$45,379 (30 June 2014: $89,760).
SIGNIFICANT CHANGES IN THE STATE OF AFFAIRS
The following significant changes in the state of affairs of the Consolidated Entity during the financial year are:
On 28 July 2014, the Company announced that it had signed a non-binding memorandum of understanding (MOU)
with a KOSDAQ listed resource development company, Korea Resources Investment & Development Inc (KORID).
The MOU provides a framework for a binding term sheet that will require the exchange of equity between
Stonehenge (via Stonehenge Korea Ltd) and KORID, such that Stonehenge Korea Ltd would be owned and controlled
on an equal and equitable basis by Stonehenge and KORID.
On 14 August 2014, the Company advised that it had entered into a binding option agreement (Option Agreement)
with Protean Energy Pty Ltd (PEL) to acquire 100% of PEL’s wholly owned subsidiary, Protean Energy Australia Pty
Ltd.
On 2 September 2014, the Company announced an equity raising of up to $1,503,643 via a pro-rata nonrenounceable rights issue of 300,728,504 new shares at $0.005.
On 10 November 2014, the Company advised that the Option Agreement to acquire PEA had been completed.
On 2 December 2014, the Company announced it entered into a binding term sheet joint venture agreement with
KORID. Stonehenge agrees to sell 50% of the issued capital in Stonehenge Korea Ltd. KORID will pay Stonehenge
A$2.4 million in consideration for the purchase of the 50% and will be paid through the issue by KORID of KOSDAQ
shares with a 12 month escrow.
There were no other significant changes in the state of affairs of the Consolidated Entity that occurred during the financial
year not otherwise disclosed in this report or the financial statements.
STONEHENGE METALS LIMITED
9
DIRECTORS’ REPORT
EVENTS SUBSEQUENT TO END OF THE REPORTING PERIOD
On 1 July 2015, the Company advised that it had entered into a convertible loan facility for up to $300,000 with a
small number of sophisticated investors. The loan is convertible into ordinary shares with attaching options. The
loan will be drawn down as required and can be converted at any point following the Company completing a capital
raising of at least $2 million and between the granting of shareholder approval and the repayment date of 31
December 2015.
On 28 July 2015, the Company announced the completion of the sale of 50% of Stonehenge Korea Limited to
KOSDAQ listed Korea Resources Investment & Development Inc.
On 11 August 2015, the Company announced:
-
it had formalised its intention to complete the acquisition of 100% of the Protean™ intellectual property by
exercising its rights under the option agreement between the Company and Protean Energy Pty Ltd;
-
that functional ocean based testing of the fully assembled proof of commercial applicability Protean™ wave
energy converter device had been successfully completed;
-
it had completed a placement to raise $500,000 to sophisticated investors via the issue of 12,500,000 new
shares at $0.04;
-
it had entered into an additional loan facility for up to $300,000 with a small number of sophisticated investors
including one of the Company’s directors, Mr Bevan Tarratt. The loan is convertible subject to shareholder
approval and the material terms and conditions are the same as the existing loan facility advised on 1 July
2015; and
-
that Bruce Lane (Managing Director), Sean Moore (Protean™ WEC Inventor & Chief Technology Officer) and
Scott Davis (General Manager Business Development) have agreed to re-contract to the Company subject to
the completion of the 100% acquisition of Protean Energy Australia Pty Ltd and successful re-compliance with
Chapters 1 and 2 of the ASX Listing Rules.
On 19 August 2015, the Company announced that its JV partner in Korea, Korea Resources Investment &
Development Inc. (KORID) sold 20% of its holding in the Korean JV entity, Stonehenge Korea Ltd (SHK), to BHI Co
Ltd (BHI). KORID and BHI have together agreed to be bound by the terms of the existing SHK shareholder agreement.
In consideration for the sale of SHK shares to BHI, KORID will receive KWON 1 Billion (~A$1.15 million).
On 10 September 2015, the Company advised that formal approval had been received to deploy 30 Protean™ WEC
buoys within the waters controlled by Bunbury Port, off the coast of Western Australia.
On 23 September 2015