Company Presentation April 2015
Released
Released
Announcement PDF
ASX:SHE
Company Presentation
April 2015
COMPANY PRESENTATION
Forward Looking and Competent Person Statement
Certain statements contained in this presentation may constitute forward looking statements. Such forward-looking statements involve a
number of known and unknown risks, uncertainties and other factors which may cause the actual results, performance of achievements of
Stonehenge Metals Limited (the Company) to be materially different from actual future results and achievements expressed or implied by
such forward-looking statements. Investors are cautioned not to place undue reliance on these forward-looking statements. The information
contained herein has been prepared solely for informational purposes and is not an offer to buy or sell or a solicitation of any offer to buy or
sell any security or to participate in any trading strategy or to enter into any transaction.
Minerals Exploration: This presentation may describe Measured, Indicated and/or Inferred Resources. Inferred Resources have a greater
amount of uncertainty as to their existence and greater uncertainty as to their economic feasibility. It cannot be assumed that all or any part of
any Inferred Resource will ever be upgraded to a higher category. The potential quantity and grade of the Daejon Uranium Project
Conceptual Exploration Targets is conceptual in nature and there has been insufficient exploration to define a Mineral Resource and it is
uncertain if further exploration will result in the determination of a Mineral Resource.
Exploration is an inherently risky proposition and investors are advised that most exploration projects fail to identify economic resources. The
Company has at present not confirmed the economic viability of any resources at the project. The Company plans further drilling programmes
and studies with the objective of confirmation of any deposits and ultimately completing a feasibility study to demonstrate the economics of
the resources.
Competent Person Statement: The information contained in this ASX release relating to exploration results and Mineral Resources has been
compiled by Mr. Ian Glacken of Optiro Ltd. Mr. Glacken is a Fellow of The Australian Institute of Mining and Metallurgy and has sufficient
experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking
to qualify as a Competent Person as defined in the 2012 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral
Resources and Ore Reserves”. Mr Glacken consents to the inclusion in the report of the matters based on his information in the form and
context in which it appears.
Renewable Energy Technology Development: Any valuations, forecasts, estimates, opinions & projections contained herein involve
elements of subjective judgment and analysis. The information contained herein has not been independently verified, nor do we make any
representation or warranty, either express or implied, as to the accuracy, completeness or reliability of the information contained in this
presentation. This presentation should not be regarded by the Recipient as a substitute for the exercise of its own judgment and the
Recipient is expected to rely on its own due diligence if it wishes to proceed further. The information contained in this presentation is intended
for information purposes only and is not intended to be a comprehensive list of the matters that need to be considered by the Recipient nor is
it intended to replace or supplement legal or investment advice given in relation to the subject matter.
April 15
2
COMPANY PRESENTATION
What If There Really Was A Solution?
April 15
3
COMPANY PRESENTATION
Annual Coastal Power Potential
The World Energy Council estimates global wave resources at around
2 million megawatt (MW) or twice the world's power consumption1.
Chart source - http://www.oceanor.com/related/59149/paper_OMAW_2010_20473_final.pdf
1 Government of Western Australia, Office of Energy www.energy.wa.gov.au/2/3698/64/wave.pm
April 15
4
COMPANY PRESENTATION
The Opportunity Is Significant
54
46
“The wave energy market
is predicted to be worth
up to $50bn by 2050”1
~Billions $AUD
38
31
23
15
7
0
1
April 15
Graph & quote are from a report on the market for renewable energy by The UK Carbon Trust. The Carbon Trust Ltd is an independent not for profit
company established by the UK Government. http://www.carbontrust.com/media/597981/marine-green-growth-carbon-trust.pdf
5
COMPANY PRESENTATION
Comparing Renewable Energy Costs
Target area of opportunity
for the Protean™ WEC
* The Company believes that these figures are indicative industry recognised values for cost per MWh for each respective renewable energy and this
chart is derived from Bloomberg New Energy Finance as published by the International Energy Agency at the following web address;
https://www.iea.org/media/workshops/2014/solarelectricity/BNEF2LCOEofPV.pdf
April 15
6
COMPANY PRESENTATION
ProteanTM Wave Energy Converter (WEC)
Key applications include:
Power and desalination plants
Utility & smaller scale
Near shore
Offshore
Remote coastal communities/islands
Self powered sonar/radar systems
Coastal stabilisation and marinas
April 15
7
COMPANY PRESENTATION
Protean Is Different
1. Converts all 6 degrees of wave motion into energy
2. Maximum energy is extracted from wave motion @ surface
3. Significantly cheaper to build, deploy & maintain; delivers
game changing power output to cost metrics
4. Configurable for virtually all wave resource locations
5. Environmentally benign – much easier to permit
April 15
8
COMPANY PRESENTATION
How The Protean WEC Works
1.The buoy moves in a circular manner when waves pass;
2.The counterweights move as the buoy moves, thereby
continuously lengthening and shortening the mooring
cables which, being hung over the pulleys, cause the
pulleys to rotate;
3.Shaft power‡ is created as the pulleys rotate. Each shaft
converts the wave energy directly into a useful form;
4.The pulleys rotate in both directions and the oscillations
are internally rectified.
‡ Shaft power is one of the most elementary means of power transmission & is easily integrated into a
wide variety of commonly used generation means such as hydraulic or electric systems
This image is a stylised representation of the Protean WEC &
does not accurately represent the actual equipment
April 15
9
COMPANY PRESENTATION
How The Protean WEC Works
Power from each pulley is unified and
produces power or desalinates water
The drive shafts turn the
energy conversion
mechanism directly
Each of the 3 pullies rotates with
the motion of the counterweight
to produce direct-drive shaft
power
The counterweight moves
up and down with the buoy
under wave motion
The seabed mooring and
mooring lines keep the device
in place
These images are stylised representations of the Protean WEC & do
not accurately represent the actual equipment
April 15
10
COMPANY PRESENTATION
Wave Energy Industry Challenges
The 5 problems most wave energy converter
technologies struggle to address...
…and how Protean solves those problems
April 15
11
COMPANY PRESENTATION
1. Efficient Conversion of Waves into Energy
Most Wave Energy Converters
Protean Wave Energy Converter
Designs compromise optimum conversion of maximum
available wave movement - especially in variable seas.
Converts all 6 degrees of movement at the surface into
energy whether in light, heavy or extreme seas
Maximum energy conversion is achieved when a wave energy converter uses all 6
degrees of wave motion to convert energy at the ocean surface.
1.
2.
3.
4.
5.
6.
April 15
Up-down (heave)
Back-and-forth (surge)
Side-to side (sway)
Yaw
Pitch
Roll
Wave energy density is
greatest at the surface
12
COMPANY PRESENTATION
2. Installation and Permitting
Most Wave Energy Converters
Protean Wave Energy Converter
Require substantial seabed works and expensive specialist
installation equipment - damage is likely if moorings fail.
Is environmentally benign, has a small footprint, is easily
installed, retrieved or relocated making permitting and
approvals simpler.
The Protean is designed for rapid and inexpensive installation
April 15
13
COMPANY PRESENTATION
3. Adaptability
Most Wave Energy Converters
Protean Wave Energy Converter
Operation is limited to certain sea states, seafloors and depths.
Adapts to varied sea states, seabeds and depths
May suffer damage in high seas & can be inefficient in light seas. without compromising energy conversion or safety.
The Protean is based on a common ocean buoy design which has worked in
oceans for many decades. It is adaptable to deep or shallow water, extreme
or light seas and variable seabed topographies
April 15
14
COMPANY PRESENTATION
4. Survivability and High Costs (Capex & Opex)
Most Wave Energy Converters
Protean Wave Energy Converter
Extreme seas challenge most WECs despite
attempts at costly engineering solutions.
The ocean buoy design has inherent survivability traits verified by
ocean use for decades.
Costly engineering solutions and long distances
from shore drive up installation and cabling costs.
Cost effective construction methods and materials combined with near
shore operation reduce installation and cabling costs.
Most are large and very costly to deploy, retrieve or Is easy to install and relocate using patented deployment technology.
re-locate.
Maintenance at sea is expensive.
Maintenance is simple, cheap & done onshore. Components are
modularised and buoys are easily re-floated, interchanged or
relocated.
The failed Oceanlinx commercial demonstrator weighed 3,000 tonnes
April 15
15
COMPANY PRESENTATION
5. Cost is a Barrier to Adoption
Most Wave Energy Converters
Protean Wave Energy Converter
Require significant capital to fund an installation (several Requires less capital up-front thus reducing adoption barriers.
$million) creating a cost barrier to adoption.
Wave farms can start very small and scale up incrementally.
High costs in construction, deployment & maintenance
drive up the cost of the energy or water produced.
Lower construction, deployment & maintenance costs combined
with an efficient solution for energy conversion can deliver much
lower energy costs.
“The Protean Equation”
More Effective Wave Conversion
Lower Setup and Lifetime Costs
Cheaper Energy
April 15
16
COMPANY PRESENTATION
Most WEC’s - Where is The Cost
Indicative levelised cost of energy components for WECs in early commercial farms
Protean Targets 3 Primary
Cost Saving Opportunities
From the Carbon Trust Report “Accelerating Marine Energy”
www.carbontrust.com/media/5675/ctc797.pdf
April 15
17
COMPANY PRESENTATION
Power Output to Weight Ratio
Comparison by Weight
150 kW
1
200 kW
180 kW
2
Protean
Protean
Wave Farm
120 x 1.5kw Buoys
Combined Mass
~35 tonne total
Protean uses
compact,
efficient
architecture to
produce power
from a small,
low cost
design
This figure is a representation based on publicly available information for competitors 1 & 2 compared with as yet untested projections for a
Protean wave farm used in an offshore environment.
The competitor 1 & 2 devices depicted are for illustration purposes only & may not be the only or most recent devices of a competitor.
April 15
18
COMPANY PRESENTATION
Protean Past Success and Future Plans
PAST
PRESENT AND FUTURE
Successfully Tested Prototype
Deploy Demonstration Wave Farm
http://proteanwaveenergy.com.au/technical/
Identify and secure deployment sites and customers.
1.5m wide proof-of-concept device successfully tested.
Deploy 1m wide “proof of commercial applicability” unit.
Device operation validated in varied depths and sea states.
Demonstrate key design improvements.
Design principles independently verified from test results.
Deploy an array (farm) of Protean WEC devices.
Simple patented deployment system demonstrated.
Confirm Protean as scalable power/water solution.
April 15
19
COMPANY PRESENTATION
Protean Technology Development Pathway
2014/15 and on
2010-2013
2008
2007-2008
2006-2007
2004-2006
Initial R&D
April 15
Desktop scale
successfully
tested
1.5m scale
prototype
designed and
built
1.5m scale
prototyping
producing Zero
Emission Energy
tested off the
Coast of Perth
WA
Demonstration
scale and device
design
modelling.
Forward
planning for
market
penetration.
Plan and
implement pilot
project for testing
array and power
integration to
satisfy customer
needs. Prepare for
commercialisation.
20
COMPANY PRESENTATION
Protean Intellectual Property
1st Patent Family
2nd Patent Family
3rd Patent Family
Foundation IP
Extensions to the
Foundation IP
Additions to the
Foundation IP
Converts
energy from 6
degrees of
freedom
Diver-less
deployment &
retrieval
Converts energy
from 5 degrees of
freedom
Ability to self adjust
for tidal variations
Novel Method for
tuning device for
max energy output
Ability to tune to
waves to optimise
energy collection
Establishes novel
tension mooring
system to convert
wave energy
April 15
Hydrodynamic
energy
conversion
technology
Integrated
transportation
No re-engineering
required for usage
at any depth
Integrated seabed
mooring
Automated
deployment &
retrieval
technology
21
COMPANY PRESENTATION
Protean Short Term Development Plan
► Install pre-commercial wave farm (Western Australia)
►
Fixed price contract to deliver project
► Wave farm of up to 30 x 1.5kW (1m diameter) Protean buoys
► Pre-commercial trials & third party reporting
► Seek Customers - Power Supply Agreements (PSAs)
► Commercialise wave farms for
small/medium customers
► Secure Australian &
international strategic alliances
April 15
22
COMPANY PRESENTATION
Growth Strategy
► Complete testing of the pre-commercial demonstration wave
farm (45 kW).
► Seek to deploy a larger scale commercial Protean wave farm.
► Expand operations around Australia and globally.
► Maximise penetration of the Protean WEC technology in
multiple market segments and geographies using strong
strategic alliance partners.
WA Deployment + US Strategy + Remote Island Installation
April 15
23
COMPANY PRESENTATION
Recent Activity
► Fabrication of 1st test buoy has commenced. Wet test to
take place when fabrication completed.
► Bill Toman (CalWave) engaged as President of US
subsidiary.
► San Marino Venture Group engaged as US advisors.
► Scott Davis (Horizon Power) engaged as business
development and commercialisation advisor.
► Evaluating local test sites for 30 buoy demonstration
wave farm.
April 15
24
COMPANY PRESENTATION
Why California
► Strong existing relationships, reputation and network.
► Powerful political commitment to leverage ocean energy
resource.
► Pressing need for new sources of clean energy due to
aggressive state and federal regulation (33% of electricity
from renewables by 2020). Governor Jerry Brown called for
this to rise to 50% by 2030.
► Severe ongoing “once in a thousand year” drought.
► Searching for viable WEC system to supply electricity &
desalinated water to population est. to be 44m by 2030.
April 15
25
COMPANY PRESENTATION
Bill Toman - President, Protean Wave Energy Inc.
► Distinguished career with PG&E, California’s largest
energy utility.
► Developed over 2,000 MW generating capacity (US &
overseas).
► Led U.S. Department of Energy funded study into siting,
cost and feasibility issues for a national wave energy test
centre off California’s coast.
► Led development of the U.S.’s first open ocean, grid-
connected wave energy testing and demonstration facility
(Humboldt WaveConnect), a 5 MW project.
April 15
26
COMPANY PRESENTATION
San Marino Venture Group
► Complement to capabilities of Bill Toman.
► Connections with key customer segments like ports, oil
companies, and power and water utilities in the US.
► Access to public & private venture and infrastructure
funding partners.
► Experience of environmental planning and infrastructure
permitting in California.
► SMVG team members worked closely with Mr. Toman
since 2008 to support U.S. wave energy industry growth.
April 15
27
COMPANY PRESENTATION
Scott Davis - Business Development Advisor
► Sales, Marketing and Commercial professional with industry
expertise including integration of renewable energy & isolated
power systems.
► With Horizon Power;
► Led
introduction of a location based renewable energy
buyback tariff for regional Western Australia;
► Led introduction of generation management requirements
for solar – a first for Australia; and
► Led innovation in design of Power Purchase Agreements to
facilitate more effective management of customer demand
and renewable energy integration.
April 15
28
COMPANY PRESENTATION
Protean Acquisition Details
► 48 month (24 + 24month) option to acquire 100% of PEA
► 60m SHE shares were issued at settlement
► 60m SHE shares to be issued at exercise of the option
► 120m performance shares to be issued at option exercise
$500k to be spent by May 2016
► Sean Moore, Protean inventor, joined SHE as Chief
Technology Officer for Wave Energy
April 15
29
COMPANY PRESENTATION
Protean Performance Shares Milestones
Performance Shares convert on a one to one basis into ordinary SHE shares upon
achievement of any one of the following targets after Completion:
►
Completion of financing of at least $5m to fund further development of the WEC
Technology, in aggregate, via equity, debt, government grant, joint venture or partnership
(or any combination thereof); or
►
Commissioning of a WEC Technology facility of 45 kW or greater outside Australia; or
►
Commissioning of a WEC Technology facility/ies of cumulative 500 kW or greater; or
►
Execution of a fully funded agreement to install a WEC Technology facility or facilities of
cumulative 1 Megawatt or greater on commercial terms; or
►
Execution of a bona fide arm’s length third party licensing, co-operation or collaboration
agreement or agreements valued cumulatively at not less than A$5m1 at the time of
signing, for the whole or part of the Protean WEC technology for assessment,
development or commercialisation.
1 Value to be determined by an independent valuer
using generally accepted valuation methodologies.
April 15
30
COMPANY PRESENTATION
Stonehenge Corporate Information
Corporate Structure
Directors, Management and Advisors
Shares on issue:
847.5 million
20/4/15 closing share price:
3.1c
Market capitalisation:
~$26 million
Cash (01/01/15)
$950k
Richard Henning – Chairman
Bruce Lane – Managing Director
Young Yu – Non Executive Director
Bevan Tarratt – Non Executive Director
Bill Toman – President, Protean Wave Energy Inc.
Scott Davis – Business Development Advisor
Top Shareholders
3 Month Price Range 0.4 - 3.6 cents/share
Protean Energy Ltd
Directors and Management
Slade Technologies
7.1%
~12.0%*
7.4%
*Incl. JLC Corporation Pty Ltd
6.24%
Top 20 holds ~38% of issued shares
September 14
31
COMPANY PRESENTATION
Stonehenge Corporate Structure
Stonehenge
Metals Ltd
ASX: SHE
Stonehenge Korea (SHK)
JV with KORID
(subject to completion)
Uranium
Vanadium
Other
Minerals
48 Month Option to Acquire PEA
Protean WEC Technology
Turnkey Project to Deliver Protean
WEC Pre-commercial
Demonstration 1
1 Fixed price ($500k) pilot project delivery agreement with Moore Commerce
April 15
32
COMPANY PRESENTATION
South Korean Vanadium and Uranium Project
•
Established Korean office/management
50%1 ownership of Korean JV Company.
•
Largest uranium resource in Korea. 67Mlbs
grading 329ppm U3O8 at 200ppm U3O8 cut-off
(JORC [2004]).
•
Maiden vanadium resource of 17.3Mlbs (95%
indicated) grading 3,186ppm V2O5 at a cut-off of
2,000ppm V2O5.
•
Significant vanadium and uranium exploration
targets (see over).
•
Significant potential upgrade of vanadium and
uranium resources.
•
Predicted low processing Opex due to successful
co-extraction of uranium and vanadium.
•
Project expected to be funded through next value
add stage via the KORID JV.
and
1 Subject to completion of JV with KOSDAQ listed “KORID” (Korea Resources Investment & Development Inc.)
April 15
33
COMPANY PRESENTATION
Mineral Resources & Vanadium Exploration Target
Vanadium Exploration Target1
U3O8 Mineral Resource Estimate at a 200 ppm U3O8 cut-off
Tonnes (Mt)
Grade V2O5 (ppm)
Contained V2O5 (Mlbs)
70 - 90
2,500 - 3,500
385 - 695
Tonnes
Mt
Grade
ppm
Metal
Mlbs
Indicated - Chubu
3.3
247
1.8
Inferred - Chubu
45.9
335
33.9
Sub-Total Chubu
49.2
329
35.7
Tonnes (Mt)
Grade U3O8 (ppm)
Contained U3O8 (Mlbs)
Inferred - Yokwang
39
310
26
15 - 59
300 - 500
17-39
Inferred - Kolnami
7
340
5
Total
95.2
329
66.7
Classification
V2O5 Mineral Resource Estimate at a 2,000 ppm V2O5 cut-off
Tonnage
Grade
Metal
Mt
ppm
Mlbs
Indicated
2.3
3,208
16.5
Inferred
0.1
2,788
0.8
Total
2.5
3,186
17.3
Classification
Uranium Exploration Target1
1The potential quantity & grade of the exploration target is conceptual in nature,
there has been insufficient exploration to define a Mineral Resource & it is
uncertain if further exploration will result in the definition of a Mineral Resource.
The vanadium and uranium exploration targets are based on exploration results
from the 2013 drilling at Chubu & Gwesan (refer announcements 15 Jul & 13 Nov
2013) that demonstrated vanadium and uranium mineralisation through the black
shales. The geology in the Okcheon belt consists of a meta-sedimentary sequence
that comprises three formations, Wunkyori, Hwajeonri & Guryongsan. The
stratigraphic sequence within the belt at the Gwesan project comprises dark grey
phyllite, overlain by the black shale (ore zone) & a fine grained sandstone. The
historical drilling at the Gwesan project has demonstrated black shale deposits
along 10km of strike. KORES completed three drill holes targeting the mineralised
black shale at Gwesan in order to verify the mineralisation zone throughout the
area. All three holes were drilled to a total depth of 100m and several ore zones
between 3m and 11m have been intercepted in each drill hole.
The best intercept of 3500 ppm V2O5 & <10 ppm U3O8 in the first hole provides encouraging results (refer ASX announcement 13 Nov 2013). More drilling
will be required to define the high grade mineralisation zone in the area. The mineralisation remains open at depth & along the 10km strike. The project is in
its exploration stage and the additional drilling is expected to increase the potential to discover high class uranium and vanadium Mineral Resources at
Gwesan. Stonehenge expects to test the validity of the exploration target once access to historical drill core is obtained and the Company is able to assay the
core for vanadium mineralisation. The Company is continuing its efforts to access the core and further updates on this progress will be advised as soon as it
becomes available. This information was prepared and first disclosed under the JORC Code 2004 (refer ASX announcement 29 Aug 2013). It has not been
updated since to comply with the JORC Code 2012 on the basis that the information has not materially changed since it was last reported.
April 15
34
COMPANY PRESENTATION
Objectives in South Korea
► Finalise JV with Korean listed partner1 via 50% sale of SHE’s Korean
sub for $2.5m scrip & $300k in year 1 placements
► Significant resources upgrade potential by testing 36,000m of core held
@ KIGAM2 – targeting much larger vanadium resource
► Move vanadium/uranium project into feasibility stage
► Work to secure strategic partnerships with Korean customers
► Nuclear power industry
► Steel makers
► Vanadium redox battery manufacturers
1 KORID (Korea Resources Investment & Development Inc.)
April 15
2 Korea Institute of Geoscience and Mineral Resources
35
COMPANY PRESENTATION
Protean & Wave Energy References
►
►
►
►
►
►
►
►
►
►
►
►
►
April 15
Australian Government. “Clean Energy Future.” Renewable Energy 2011 www.cleanenergyfuture.gov.au (accessed
21/10/2011).
Carbon Trust. http://www.carbontrust.co.uk.
Danish Energy Association. “Danish Energy Supply 09 Statistical Survey.” Danish Energy Association. 24 August 2010.
http://www.danishenergyassociation.com (accessed October 20, 2011).
EcoGeneration “Ocean power experts.” EcoGeneration Magazine, July/August 2010: http://ecogeneration.com.au.
“Enhancing Australia's Economic Prosperity.” Australian Government Department of Resources, Energy and Tourism.
14 July 2011. www.ret.gov.au (accessed October 20, 2011).
European Renewable Energy Council. “Renewable Energy Policy Review Denmark.” European Renewable Energy
Council. March 2009. www.erec.org (accessed October 20, 2011).
Foreign Exchange.org.uk. http://www.foreignexchange.org.uk/fx-rates/conversion/150/DKK/AUD (accessed
20/10/2011).
Hemmer, M A, and A D Griffin. “The Wave Energy Resources along Australia's Southern Margin.” Journal of Renewable
and Sustainable Energy 2, no. 043108 (2010): 2.
Leare, David, and Miguel Estaban. “Climate Change & Renewable Energy from the Ocean & Tides: Calming the Sean
of Regulatory Uncertainty.” The International Journal of Marine and Coastal Law, 2009: 617-651.
Milan, Dr Laurence. “Submissions to the Senate Joint Select Comittee of Fuel and Energy.” Parliament of Australia
Senate Committees. Carnegie Corporation Ltd. August 2008. www.aph.gov.au (accessed 21/10/2011).
“Paperwork”, Kozumel, Creative Commons, Flickr. http://www.flickr.com/photos/kozumel/2228603119/
Renewable Energy Policy Network for the 21st Century. Rewewables 2011 Global Status Report. Status Report, Milan:
REN21, 2011.
Wells, Dr Nick, and Dr Mike Shaw. Reniew of Engineering and Specialist Support Requirement for the Ocean Energy
Sector. Review, RPS Group Plc.
36
COMPANY PRESENTATION
Contacts
• Bruce Lane – Managing Director
• T: + 61 8 9481 2276
Office Address
Level 3
89 St Georges Terrace
Perth 6000
Telephone: +61 8 9481 2277
Fax: +61 8 9481 2355
Korean Office Address
c/o Stonehenge Korea
15th Floor, Kyobo Building,
1 Jongno, Jongno-gu
Seoul 110-714, Korea
서울특별시 종로구 종로1 교보빌딩 15층
우편번호: 110-714
• Email: admin@stonehengemetals.com.au
• www.stonehengemetals.com.au
• www.proteanwaveenergy.com.au
April 15
Postal address
PO Box 7631, Cloisters Square, Perth 6850
37
Share your feedback
Discover