The Caroline well produces over 165,000 BOE in first 135 days
of production. The Gryphon Wapiti well produces over 17,000
BOE in first 60 days production.
The Manager
Market Announcements Office
Level 40, Central Park,
152-158 St George's Terrace
Perth WA 6000
ACN: 086 972 429
Perth, Western Australia – 8th March 2024 – Stonehorse Energy Limited (ASX:
SHE) is pleased to announce production volumes for the producing Caroline
and Wapiti wells located in Alberta, Canada.
Key Highlights:
E: info@stonehorseenergy.com
W: stonehorseenergy.com
Directors
Rob Gardener, Executive Chairman
David Deloub, Executive Director
Jay Stephenson, Non-Executive
Director & Company Secretary
Issued Capital (ASX: SHE)
684.4m Ordinary Shares
Media and Enquiries
Andrew Rowell
White Noise Communications
E: andrew@whitenoisecomms.com
T: 0400 466 226
Investor Hub
Visit the Investor Hub here:
https://investorhub.stonehorsee
nergy.com/welcome
Caroline 01-27-33-05 well production performance:
• Produced over 165,000 BOE (Raw Sales) in the first 135 days of
production.
• The Caroline well’s IP 135 average production was an impressive 1,220
BOE per day of gross sales or 320 BOE per day net to Stonehorse (26.25%
working interest).
• An increase facility capacity and removal of a down hole choke in early
February 2024 has resulted in a significant (~30%) increase in daily
production rates.
• Current daily production as at March 1st, 2024 (estimated sales): BOE
8/8ths: 1,580 BOEPD with Stonehorse’s current BOE net equivalent (26.25%):
415 BOED
Wapiti 16-02-65-08 well production performance:
• Project completed on time and budget with no accidents or incidents.
• The well production was brought online to a permanent facility January 1,
2024.
• Produced over 17,000 BOE in the first 60 days of production on natural flow.
• Current IP 60 average production: 290 boepd.
• The well production is being optimized with contingency for plunger lift
installation if and when required.
• Light oil is being trucked to terminal and associated gas in being gathered
and processed at regional third-party gas plant.
1
Stonehorse Executive Director David Deloub commented:
“We are pleased with the performance of both of our first two Western Canadian oil and gas well
investments. The Caroline well in particular continues to deliver material production and revenue,
more than doubling the company’s total daily production. As we add new production and generate
revenue in the area, we continue to evaluate and prioritize accretive opportunities available to us”.
Caroline HZ 103 Raw Production History
2024 Producing Days
7000
6000
IP 137 Gas: 4650 mcfd
IP 137 Condensate: 204 bcpd
97% Uptime
300
275
250
225
Gas mcf/day
200
5000
175
Re-size DHC
& Inc Rate
4000
150
125
3000
100
2000
1000
Plant
Weather
Downtime
Condensate bbl/day
8000
75
Planned
Wellwork
50
Gas
Condensate
19-Feb
26-Feb
0
25
0
1-Jan
8-Jan
15-Jan
22-Jan
29-Jan
5-Feb
12-Feb
Producing Days
Figure 1. Caroline 01-27 Well production history for 2024.
2
Wapiti Well 16-2
60 Days
500.0
IP 60: 140 BOPD, 908 mcf/d, 290 BOEPD
53 BOEPD net SHE (18.25%)
450.0
Barrels Fluid Per Day
400.0
350.0
BOEs
300.0
250.0
200.0
150.0
100.0
Water
50.0
0.0
1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41 43 45 47 49 51 53 55 57 59 61 63
January 2024 Producing Day
Wtr BPD
BOEPD
Figure 2. Wapiti 16-02 Well Production History for 2024.
About Stonehorse Energy
Stonehorse Energy Limited (ASX:SHE) is an Australian based E&P company with a focus on onshore
oil and gas in North America. The overall objective of the Company is to implement its strategy of
building a portfolio of high quality well bore assets with Working Interest (WI) percentages reflecting
risk appetite and capital availability.
- ENDS –
For further information:
For Media enquiries
David Deloub
Executive Director
Stonehorse Energy Limited
Tel: (+61 8) 6489 1600
E: info@stonehorseenergy.com
Andrew Rowel
Senior Communications Advisor
White Noise Communications
Tel: 0421 505 557
E: andrew@whitenoisecomms.com
Forward-Looking Statements and Other Disclaimers
This announcement may include forward-looking statements. Forward-looking statements are only predictions
and are subject to risks, uncertainties and assumptions, which are outside the control of Stonehorse Energy
Limited (“Stonehorse Energy” or “the Company”). These risks, uncertainties and assumptions include commodity
prices, currency fluctuations, economic and financial market conditions in various countries and regions,
environmental risks and legislative, fiscal or regulatory developments, political risks, project delay or
advancement, approvals and cost estimates. Actual values, results or events may be materially different to
those expressed or implied in this announcement. Given these uncertainties, readers are cautioned not to place
reliance on forward-looking statements. Any forward-looking statements in this announcement speak only at
the date of issue of this announcement. Subject to any continuing obligations under applicable law and the
ASX Listing Rules, Stonehorse Energy does not undertake any obligation to update or revise any information or
3
any of the forward-looking statements in this announcement or any changes in events, conditions, or
circumstances on which any such forward looking statement is based. This announcement does not constitute
investment advice. Neither this announcement nor the information contained in it constitutes an offer, invitation,
solicitation, or recommendation in relation to the purchase or sale of shares in any jurisdiction. Shareholders
should not rely on this announcement. This announcement does not take into account any person's particular
investment objectives, financial resources or other relevant circumstances and the opinions and
recommendations in this announcement are not intended to represent recommendations of particular
investments to particular persons. All securities transactions involve risks, which include (among others) the risk of
adverse or unanticipated market, financial or political developments. The information set out in this
announcement does not purport to be all-inclusive or to contain all the information, which its recipients may
require to make an informed assessment of Stonehorse Energy. You should conduct your own investigations and
perform your own analysis to satisfy yourself as to the accuracy and completeness of the information, statements
and opinions contained in this announcement. To the fullest extent permitted by law, the Company does not
make any representation or warranty, express or implied, as to the accuracy or completeness of any
information, statements, opinions, estimates, forecasts or other representations contained in this announcement.
No responsibility for any errors or omissions from this announcement arising out of negligence or otherwise is
accepted.
GLOSSARY
BCF
Billion cubic feet.
BOE
Barrels of Oil Equivalent
Development Unit
(DSU)
Development unit or Drilling Spacing Unit (DSU) is the geographical area in which an initial oil and or
gas well is drilled and produced from the geological formation listed in the spacing order. The spacing
unit combines all interest owners for the purpose of sharing in production from oil and or gas wells in
the unit. A spacing order establishes the size of the unit, divides the ownership of the unit into the
“royalty interest” and “working interest”.
E&P
Exploration and Production
NWI
Net Working Interest – Working interest net of the agreed override with the vendor.
NGL
Natural Gas Liquids
Mcfd
1,000 cubic feet (of gas) per day
MMcfd
1,000,000 cubic feet (of gas) per day
Mboe
1,000 barrels of oil equivalent
MMboe
1,000,000 barrels of oil equivalent
O&G
Oil and Gas
WI
Working Interest - Percentage of ownership in a lease granting its owner the right to explore, drill and
produce oil and gas from a tract of property. Working interest owners are obligated to pay a
corresponding percentage of the cost of leasing, drilling, producing, and operating a well or unit
Spud
Commencement of drilling the well.
4