QUARTERLY ACTIVITIES REPORT
ASX CODE: SHE
PERIOD ENDING 30 JUNE 2015
HIGHLIGHTS
Stonehenge Metals Limited
Agreements signed with San Marino
Venture Group and Yanchep Beach Joint
Venture (YBJV) to provide support and
progress the commercialisation of the
Protean Wave Energy Convertor (WEC),
including the potential development of
a Protean WEC wave farm off the coast
of Western Australia
MOU signed with Cal Poly to support
application for US$1.5 million award
offered by the U.S Department of Energy
(DOE)
Major structural component build,
assembly and workshop testing of a
single Protean WEC complete
Ocean based wet testing now in
progress
Two key appointments made with Mr
Brendan Hammond appointed as
Chairman of the Board and Mr Scott
Davis as advisor to the Company, both
industry veterans bringing significant
experience and expertise
The sale of 50% of Stonehenge Korea Ltd
to Koran Resources Investment &
Development Inc. (KORID) has now
been completed to create a joint
venture (JV)
ABN 81 119 267 391
Office J, Level 2,
1139 Hay Street
West Perth WA 6001
T: +61 8 9481 2277
www.stonehengemetals.com.au
Enquiries regarding this report may be
directed to:
Bruce Lane
Managing Director
Matthew Foy
Company Secretary
Page 1 of 7
Stonehenge Metals Limited (ASX:SHE) (Stonehenge or the Company) is pleased to provide shareholders with
the following quarterly activities report for the June quarter.
Protean Wave Energy
During the quarter, the Company engaged California-based San Marino Venture Group LLC (SMVG) to provide
advisory support for the commercialisation of the Protean Wave Energy Convertor (WEC) technology in the
U.S as part of the Company’s global commercialisation strategy. SMVG has a highly experienced and skilled
team and is expected to add credibility and the know-how to commercialise the Protean WEC technology in
the U.S.
Stonehenge also signed a Memorandum of Understanding with California Polytechnic University at San Luis
Obispo (Cal Poly) to support their application for a US$1.5 million award offered by the U.S Department of
Energy (DOE). The funding is to support the next phase of the Cal Wave initiative, which is one of a number
of projects created under the Institute for Advanced Technology and Public Policy (IATPP) at Cal Poly. The
mission of the IATPP is to develop and promote practical solutions to real word problems by informing and
driving public policy. The Cal Wave project is in place to assess the feasibility of siting the planned National
Wave Energy Test Facility in California and has to date been funded by the DOE through an initial $750,000
funding award. Stonehenge will serve as a contributing WEC technology proponent, with the potential to be
deployed into the facility in California.
The Company also signed a Memorandum of Understanding with Yanchep Beach Joint Venture (YBJV) for
collaboration on the development of a Protean WEC wave farm off the coast of Western Australia to
potentially supply the community at Two Rocks. The Memorandum of Understanding supports Stonehenge’s
commercialisation strategy and will initially begin with a single 1.5 kW buoy followed by a 30x1.5 kW buoy
(45 kW) demonstration wave farm.
In addition, during the quarter the Company completed the major structural component build and assembly
of the Protean WEC, a landmark event in the Company’s development path. Bench testing and calibration of
core energy conversion system components is now concluded with ocean based wet testing now in progress.
The Company has progressed well with the development of Protean WEC technology and its go to market
commercialisation strategy. During the quarter, the Company established a number of key partnerships in
the U.S to secure further funding and accelerate its path to market.
Stonehenge has also been focused on opportunities in Australia as it looks to establish an offshore wave farm
in Western Australia with Yanchep Beach Joint Venture to potentially supply the community at Two Rocks.
Fabrication of the 30 WEC buoy array, which will make up the planned demonstration wave farm, is expected
to commence once the wet testing of the individual Protean WEC buoy is successfully concluded.
Stonehenge Korea
Subsequent to the quarter Stonehenge completed the formal joint venture (JV) with KOSDAQ listed Korean
Resources Investment & Development Inc. (KORID). The JV is created via the sale to KORID of 50% of
Stonehenge Korea Ltd. The JV is initially focused on accelerating development of the Daejon vanadium and
uranium project by conducting work to contribute to the preparation of a pre-feasibility study. The JV aims
to:
Secure a collaboration agreement with the Korean Institute of Geoscience and Mineral Resources
(KIGAM) to test the relevant sections from within the 36,000 metres of mineralised historical drill core
(from Stonehenge Korea’s Daejon Project area) stored at KIGAM; and
Significantly upgrading the current Daejon Project resource estimates in size and or confidence.
Page 2 of 7
Corporate
In June 2015, the Company appointed Mr Brendan Hammond as Chairman of the Board. Mr Hammond has a
wealth of experience within the resources, energy and infrastructure industries. The Stonehenge board
believes that Brendan’s unique mix of experience and skills, combined with his passion for sustainable
development, positions him to be a very effective chairman of the Company’s board. We are particularly
looking forward to leveraging the experience and networks he has built up through his roles as Chairman of
Horizon Power, Chairman of Dampier Port Authority, board member for the Water Corporation (WA),
Managing Director of Argyle Diamonds (Rio Tinto) and development approvals consultant to the Premier of
Western Australia. Mr Richard Henning resigned from the board effective 1 July 2015.
Convertible Loan Facility
Subsequent to the quarter on 1 July 2015 the Company entered into a convertible loan facility for up to
$300,000 (Loan) with a small number of sophisticated investors (Lenders). The Loan is convertible, subject to
shareholder approval, into ordinary shares with attaching options. The conversion price for the issue of shares
will be 3.5 cents per share which represents a 20% discount to the 10-day VWAP for the 10 traded days prior
to this announcement (Conversion Price). One free attaching option will be issued, for every two shares issued
on conversion, with a strike price of 5.3 cents, which represents a 50% premium to the Conversion Price.
The Loan will be drawn down as required by the Company and can be converted at any point after the
Company completes a capital raising of at least $2 million and between the granting of shareholder approval
and the repayment date of 31 December 2015.
The Facility may, by mutual agreement with the Lenders, be increased by up to an additional $300,000 on the
same terms as the initial Principal Amount.
A notice of meeting to approve the convertibility of the debt will be despatched to shareholders in due course.
For further information visit: www.stonehengemetals.com.au or www.proteanwavenergy.com.au
Stonehenge Metals Limited
Bruce Lane – Executive Director
T: + 61 8 9481 2276
E: blane@stonehengemetals.co
Page 3 of 7
ABOUT THE PROTEAN WAVE ENERGY CONVERTER (WEC) TECHNOLOGY
Stonehenge has entered into an option agreement to purchase the Protean WEC technology. The Protean WEC system is
based upon a point-absorber wave energy converter buoy device, which floats at the water surface and extracts energy
from the waves by the extension and retraction of a tether to its anchoring weight on the seabed. The device is unique in
that it optimises the conversion of energy from waves at the surface through all six degrees of wave movement.
Figure 1:
Protean WEC
technology
The Protean WEC has been developed to use compact architecture to produce power from a small, low cost, scalable
design targeted at keeping the projected levelised cost of energy (LCOE)1 down. The Protean WEC has been designed to
be cost competitive to manufacture, deploy, maintain and retrieve. The future plans for the Protean WEC include the
deployment of a pre-commercial demonstration of a dynamic, configurable and scalable power array prior to moving the
technology into early commercialisation. During the Option period the Stonehenge assessment program aims to:
1.
2.
3.
4.
5.
Refine the tried and proven scale device to produce a suitable pre-commercial model;
Create a scalable power array so as to provide the power requirements of a prospective customer;
Test the scalable power array for its potential to deliver cost effective power;
Verify the results, including commissioning of an independent expert to qualify the testing results; and
Commence commercialisation of the scalable array for small to medium customers.
Protean Wave Energy Converter (WEC) Design, Construction and Deployment
For further information visit: www.proteanwaveenergy.com.au or www.stonehengemetals.com.au
1
Levelised cost of energy is one of the industry’s main metrics for the cost of electricity produced. It accounts for all of a
system’s expected lifetime costs (incl. construction, finance, fuel, maintenance, tax, insurance & incentives), which are
then divided by the system’s lifetime expected power output (kWh) & discounted for inflation & time cost of money.
Page 4 of 7
ABOUT STONEHENGE KOREA LIMITED
Stonehenge Metals Limited (ASX Code: SHE) is developing a multi-mineral project in South Korea through its
50% holding in Stonehenge Korea Limited. Stonehenge Korea Limited owns 100% of the rights to three projects
in South Korea, including the Company’s flagship Daejon Project, which contains the largest uranium resource
within South Korea at 66.7Mlbs grading 329ppm U3O8 at a cut-off of 200ppm U3O8 (JORC 2004 compliant).
Recently, the Company established a maiden vanadium resource of 17.3Mlbs (largely indicated) grading
3,186ppm V2O5 at a cut-off of 2,000ppm V2O5.
South Korean Project Locations
U3O8 Mineral Resource Estimate at a 200 ppm U3O8 cut-off
Indicated - Chubu
Tonnes
Mt
3.3
Grade
ppm
247
Metal
Mlbs
1.8
Inferred - Chubu
45.9
335
33.9
Sub-Total Chubu
49.2
329
35.7
Inferred - Yokwang
39
310
26
Inferred - Kolnami
Total
7
95.2
340
329
5
66.7
Classification
V2O5 Mineral Resource Estimate at a 2,000 ppm V2O5 cut-off
Indicated
Tonnage
Mt
2.3
Grade
ppm
3,208
Metal
Mlbs
16.5
Inferred
0.1
2,788
0.8
Total
2.5
3,186
17.3
Classification
Vanadium Exploration Target1
Tonnes (Mt)
Grade V2O5 (ppm)
Contained V2O5 (Mlbs)
70 - 90
2,500 - 3,500
385 - 695
Tonnes (Mt)
15 - 59
Uranium Exploration Target1
Grade U3O8 (ppm) Contained U3O8 (Mlbs)
300 - 500
17-39
1
The potential quantity & grade of the
exploration target is conceptual in nature,
there has been insufficient exploration to
define a Mineral Resource & it is uncertain
if further exploration will result in the
definition of a Mineral Resource.
The vanadium and uranium exploration
targets are based on exploration results
from the 2013 drilling at Chubu & Gwesan
(refer announcements 15 July & 13
November 2013) that demonstrated
vanadium and uranium mineralisation through the black shales.
The geology in the Okcheon belt consists of a meta-sedimentary sequence that comprises three formations,
Wunkyori, Hwajeonri & Guryongsan. The stratigraphic sequence within the belt at the Gwesan project
comprises dark grey phyllite, overlain by the black shale (ore zone) & a fine grained sandstone.
The historical drilling at the Gwesan project has demonstrated black shale deposits along 10km of strike.
KORES completed three drill holes targeting the mineralised black shale at Gwesan in order to verify the
mineralisation zone throughout the area. All three holes were drilled to a total depth of 100m and several ore
zones between 3m and 11m have been intercepted in each drill hole.
The best intercept of 3500 ppm V2O5 & <10 ppm U3O8 in the first hole provides encouraging results (refer ASX
announcement 13 Nov 2013). More drilling will be required to define the high grade mineralisation zone in
the area. The mineralisation remains open at depth & along the 10km strike. The project is in its exploration
stage and the additional drilling is expected to increase the potential to discover high class uranium and
vanadium Mineral Resources at Gwesan. Stonehenge expects to test the validity of the exploration target
Page 5 of 7
once access to historical drill core is obtained and the Company is able to assay the core for vanadium
mineralisation.
The Company is continuing its efforts to access the core and further updates on this progress will be advised
as soon as it becomes available. This information was prepared and first disclosed under the JORC Code 2004
(refer ASX announcement 29 August 2013). It has not been updated since to comply with the JORC Code 2012
on the basis that the information has not materially changed since it was last reported.
Competent Person’s statement
The information contained in this ASX release relating to exploration results and Mineral Resources has been compiled
by Mr. Ian Glacken of Optiro Ltd. Mr. Glacken is a Fellow of The Australian Institute of Mining and Metallurgy and has
sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the
activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the “Australasian
Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Mr Glacken consents to the inclusion
in the report of the matters based on his information in the form and context in which it appears.
Page 6 of 7
Appendix 1 - Stonehenge Korea Limited Tenement Details
Registration
Number
Land
Register
Number
Area
(ha)
Interest
%
Registration
Date
76967
Gwesan
114
275
100%
28/05/2008
Stonehenge Korea
76942
Gwesan
115
275
14/05/2008
Stonehenge Korea
76965
Gwesan
117
275
28/05/2008
Stonehenge Korea
76966
Gwesan
118
275
28/05/2008
Stonehenge Korea
76964
Gwesan
124
275
28/05/2008
Stonehenge Korea
76941
Gwesan
125
275
14/05/2008
Stonehenge Korea
76968
Gwesan
126
275
28/05/2008
Stonehenge Korea
76969
Gwesan
128
275
28/05/2008
Stonehenge Korea
79161
Gwesan
137
275
12/01/2011
Stonehenge Korea
77018
Miwon
36
276
11/06/2008
Stonehenge Korea
77019
Miwon
46
276
11/06/2008
Stonehenge Korea
77020
Miwon
58
276
11/06/2008
Stonehenge Korea
77225
Miwon
37
276
21/08/2008
Stonehenge Korea
77291
Miwon
47
276
23/09/2009
Stonehenge Korea
77292
Miwon
57
276
23/09/2009
Stonehenge Korea
77010
Okcheon
136
138
10/06/2008
Stonehenge Korea
77011
Daejon
18
277
10/06/2008
Stonehenge Korea
77012
Daejon
28
259
10/06/2008
Stonehenge Korea
77013
Daejon
38
277
10/06/2008
Stonehenge Korea
77014
Daejon
48
277
3/07/2008
Stonehenge Korea
77038
Ogchon
147
277
19/06/2008
Stonehenge Korea
19/06/2008
Stonehenge Korea
3/07/2008
Stonehenge Korea
3/07/2008
Stonehenge Korea
16/10/2008
Stonehenge Korea
16/10/2008
Stonehenge Korea
18/12/2012
Stonehenge Korea
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
Registrant
Property
Goesan
[Gwesan]
Miwon
100%
77039
Daejon
17
103
77114
Daejon
7
190
77115
Daejon
27
56
77363
Daejon
47
242
77364
Daejon
57
186
200204
Daejon
59
228
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
Daejon
[Daejeon]
Page 7 of 7