Disclaimer
Certain statements contained in this presentation may constitute forward looking statements. Such forward-looking statements involve a number of
known and unknown risks, uncertainties and other factors which may cause the actual results, performance of achievements of Stonehenge Metals
Limited (the Company) to be materially different from actual future results and achievements expressed or implied by such forward-looking
statements. Investors are cautioned not to place undue reliance on these forward-looking statements. The information contained herein has been
prepared solely for informational purposes and is not an offer to buy or sell or a solicitation of any offer to buy or sell any security or to participate in
any trading strategy or to enter into any transaction.
Renewable Energy Technology Development: Any valuations, forecasts, estimates, opinions & projections contained herein involve elements of
subjective judgment and analysis. The information contained herein has not been independently verified, nor do we make any representation or
warranty, either express or implied, as to the accuracy, completeness or reliability of the information contained in this presentation. This presentation
should not be regarded by the Recipient as a substitute for the exercise of its own judgment and the Recipient is expected to rely on its own due
diligence if it wishes to proceed further. The information contained in this presentation is intended for information purposes only and is not intended to
be a comprehensive list of the matters that need to be considered by the Recipient nor is it intended to replace or supplement legal or investment
advice given in relation to the subject matter.
Minerals Exploration: This presentation may describe Measured, Indicated and/or Inferred Resources. Inferred Resources have a greater amount of
uncertainty as to their existence and greater uncertainty as to their economic feasibility. It cannot be assumed that all or any part of any Inferred
Resource will ever be upgraded to a higher category. The potential quantity and grade of the Daejon Uranium Project Conceptual Exploration Targets
is conceptual in nature and there has been insufficient exploration to define a Mineral Resource and it is uncertain if further exploration will result in
the determination of a Mineral Resource.
Exploration is an inherently risky proposition and investors are advised that most exploration projects fail to identify economic resources. The
Company has at present not confirmed the economic viability of any resources at the project. The Company plans further drilling programmes and
studies with the objective of confirmation of any deposits and ultimately completing a feasibility study to demonstrate the economics of the resources.
Competent Person Statement: The information contained in this ASX release relating to exploration results and Mineral Resources has been
compiled by Mr. Ian Glacken of Optiro Ltd. Mr. Glacken is a Fellow of The Australian Institute of Mining and Metallurgy and has sufficient experience
which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a
Competent Person as defined in the 2012 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore
Reserves”. Mr Glacken consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.
August 15
2
Company Overview – Transitioning To Renewable Energy
Stonehenge Metals (ASX:SHE) has
exercised its option to acquire 100%
of Protean Energy Australia Pty Ltd
(PEA) which owns the intellectual
property rights to the ProteanTM Wave
Energy Converter (WEC).
ASX
SHE
Shares on issue:
847.5 million
Market capitalisation: ~$38 million
52-week Share Price
$0.004 - $0.06
Cash
~$800k*
Top Shareholders
• Protean Energy Ltd (Vendors)
• Directors and management
• Slade Technologies
7.6%
** Including JLC Corporation Pty Ltd
6.24%
~12.0%**
7.4%
Top 20 holds ~37% of issued shares
* on 11/08/2015 the Company announced to ASX a placement to raise $500,000 and an additional $300,000 loan facility.
August 15
3
Path to Recompliance and Capitalisation
• Exercise of Option over PEA will result in a change in the Company’s nature and scale of activities and
will require shareholder approval under Chapter 11 of the ASX Listing Rules.
• The Company intends to re-comply with Chapters 1 and 2 of the ASX Listing Rules and expects to seek
shareholder approval to issue a re-compliance prospectus to raise sufficient funds to accelerate
commercialisation of the Protean WEC technology.
• A notice of meeting is expected to be dispatched to seek approval for the above matters including
changing the company name to Protean Wave Energy Limited.
• An indicative timetable (subject to change) for the Acquisition is set out below.
Event
Date
Announcement of Exercise of the Option
11 August 2015
Dispatch Notice of Meeting
27 August 2015
Lodgement of Prospectus and offer open
23 September 2015
Shareholder meeting to approve Acquisition and Securities suspended from trading 28 September 2015
Offer Close
14 October 2015
Satisfaction of ASX Listing Rules re-compliance conditions
21 October 2015
Re-admission to the Official List
30 October 2015
The process of re-compliance is not expected to require a consolidation of the Company’s share capital.
August 15
4
Board and Management
Mr Brendan Hammond
Non-Executive Chairman
Cit.WA
Mr Hammond spent 24 years with Rio Tinto culminating in his appointment as Managing
Director at Argyle Diamonds Limited where he led a turnaround to create a highly profitable
business. Brendan was subsequently appointed as Chairman of Horizon Power (WA’s
largest regional power company) and Dampier Port Authority Boards. He has also been a
member of Western Australian Watercorp Board and is currently Chairman of Centric Digital
International Ltd and Professor Adj. of Sustainability at Curtin University, WA.
Mr Bruce Lane
Managing Director
B.Com, MSc, GAICD
Mr Lane has a broad range of operational, management and corporate experience including
past roles as Director of a number of listed companies. Mr Lane has worked with several
early stage technology and minerals exploration companies as an advisor, investor, director
and manager. Prior to completing a Sloan Fellowship Master's degree at London Business
School (LBS) Mr Lane gained 13 years of international management experience with global
'blue chip' companies.
Sean Moore
BEng, BSc
Chief Technology Officer
(Inventor of ProteanTM
WEC)
Mr William (Bill) Toman
President of US
Subsidiary (Protean Wave
Energy Inc.)
August 15
Sean Moore is the founder and inventor of the Protean™ wave energy converter technology
and has over 60 international patent applications on ocean energy technologies. Sean has
been the recipient of many awards and scholarships and is recognized for his expertise in
ocean energy. He was a panellist on the highly popular Ocean Energy Panel at the inaugural
2009 Asia Pacific Clean Energy Summit in Hawaii. Sean holds a Bachelor of Engineering
(Honours), and a Bachelor of Science, from Edith Cowan University.
Mr Toman has developed over 2,000 MW of generating capacity in the USA and overseas.
He led a U.S. Department of Energy (DOE) funded study investigating siting, cost and
feasibility issues for developing a national wave energy test centre off California’s coast for
Pacific Gas and Electric Company. Mr Toman also led development of the U.S.’s first open
ocean, grid-connected wave energy testing and demonstration facility (Humboldt
WaveConnect), a 5 MW project.
5
Board and Management (continued)
Mr Scott Davis
General Manager
Business Development*
Mr Davis has over 20 years’ experience across the Electricity and Resource sectors in
Australia, Canada and the Solomon Islands. He led the introduction of a location based
renewable energy buyback tariff for Regional Western Australia together with the
introduction of generation management requirements for solar – a first for Australia. He also
led innovation in the design of Power Purchase Agreements to facilitate significant cost
reductions, balance sheet benefits, and more effective management of customer demand
and renewable energy integration.
Mr Young Yu
Director & CEO Korea
B.Bus, MBA, CPA
Mr Yu has extensive private and public sector experience in finance, consulting, trade and
international business in both Australia and Korea. Mr Yu worked as the Trade
Commissioner to the Australian Trade Commission within the Australian Embassy in Seoul,
Korea and was the Regional Director/Representative for the Western Australian Trade and
Investment Office in Seoul, Korea.
Mr Bevan Tarratt
Non-Executive Director
B.Com
Mr Tarratt has an extensive background in the accounting and financial services industries
having worked in various local accounting and broking firms for the past 10 years. He has
been a director of a number of ASX listed companies. He has a breadth of corporate
experience with a deep understanding of capital markets and international taxation.
* Subject to ASX re-compliance
August 15
6
Investment Proposition – Wave Energy Technology
• Renewable energy technology with unique IP − exclusive IP rights and international
patents based on over 10 years in development
• Significant market opportunity − wave energy industry estimated by The UK Carbon
Trust to be worth $50 billion by 2050
• Focused commercialisation strategy in large niche’s - initially targeting diesel
displacement for remote islands, coastal communities, ports and coastal industry
• Technology validation - through historical prototyping, independent reviews, testing
results. Leading U.S Wave Technology University, California Polytechnic (Cal Poly) has
selected Protean as part of a testing and evaluation program under the Stonehenge –
Cal Poly MOU
• Targeting sustainable energy production − aim is to provide a better way to convert
wave energy with significant cost saving potential for clients and users
• Strong leadership team - track record in wave energy, energy industry, electric and water
utilities, international business and corporate
August 15
7
Why Wave Energy
Wind Power and Solar PV Core Challenges
Intermittency
Predictability
Source: www.powermag.com/renewable-intermittency-is-real/?pagenum=3
August 15
8
Annual Coastal Power Potential
The Protean™ WEC could be deployed in a wide variety of locations globally
Source - http://www.oceanor.com/related/59149/paper_OMAW_2010_20473_final.pdf
August 15
9
What is the Protean™ WEC
• Unique proprietary technology, which is designed to convert waves
effectively into energy, using all six degrees of freedom*. Protean™ uses
compact architecture to produce power from a small, low cost design
• The Protean™ WEC is positioned to penetrate the global renewable
energy sector through its potential to produce scalable cost effective
energy. The Protean™ is;
− Designed to be cost effective due to an ability to utilise all 6 degrees of wave
motion combined with low set up and maintenance costs
− Designed to scale easily by adding extra devices to grow capacity
− Designed to minimise environmental impact during project lifecycles
* Utilizes all 6 degrees of Wave Movement
1. Up-down (heave)
2. Back-and-forth (surge)
3. Side-to side (sway)
4. Yaw
5. Pitch
6. Roll
August 15
10
Technology Status
Functional ocean testing successfully completed:
•
•
•
•
Beach launching equipment
Protean™ mooring system
Counterweights
Buoy and energy conversion mechanism
Energy transmission and storage system prototype
with associated compressed air electrical
generator tested, to power a lit display box
Next Phase of Commercialisation Program
Work commenced to build 30 x 1.5kW Protean™
WEC buoys for deployment of a 45kW precommercial demonstration wave farm off Western
Australia
August 15
11
Wave Energy Potential
The World Energy Council estimates global wave resources at around 2 million
megawatt (MV) or twice the world’s power consumption per annum
Wave – Global Market Size 2010–2050
60
The wave energy
market is predicted to
be worth up to
50
40
30
$50bn by 2050
20
10
0
2010
2020
2030
Medium
August 15
2040
High
2050
Report on the market for renewable energy by The
UK Carbon Trust.
http://www.carbontrust.com/media/597981/marinegreen-growth-carbon-trust.pdf
12
Wave Energy Industry Challenges
Industry Challenges
JRC* estimates that 45 WEC’s are in advanced development globally but none have
been properly commercialised to date due to the inherent challenges faced.
Efficient
conversion of
waves into
energy
Installation and
permitting
Adaptability –
ability to deploy
into the seabed
Survivability and
high costs
High barriers to
adoption
Designs often
compromise
optimum
conversion of
maximum available
wave movement
Can require
substantial seabed
works and
expensive
specialist
installation
equipment damage is likely if
moorings fail.
Permitting in many
locations has
proven to be an
expensive and
lengthy process
Operation is often
limited to certain
sea states,
seafloors and
depths
Costly engineering
solutions and long
distances from
shore drive up
installation and
submarine cabling
costs. Most are
large and very
costly to deploy,
retrieve or relocate.
Maintenance at
sea is very
expensive
Require significant
capital to build and
expensive
specialist
capabilities to
install – this can
create a significant
barrier to adoption
* JRC Ocean Energy Status Report, 2014 - https://setis.ec.europa.eu/system/files/2014%20JRC%20Ocean%20Energy%20Status%20Report.pdf
August 15
13
The ProteanTM Solution*
ProteanTM Response
Protean’s WEC is designed for natural advantages in energy and water production.
Effective
wave energy
conversion
Easy to install &
environmentally
friendly
Adaptable
Low cost
to build and
maintain
Reduces barriers
to adoption
Designed to convert
all 6 degrees of
movement at the
ocean’s surface into
energy whether in
light, heavy or
extreme seas
Designed to be
environmentally
benign with a small
ocean and seabed
footprint, easily
installed, retrieved or
relocated, facilitating
permitting and
approvals
Designed to adapt to
varied sea states,
seabeds, distances
from shore and
depths
Designed for cost
effective construction
and operation to
reduce installation
costs. Designed to be
easy to install and
relocate using
patented deployment
technology.
Maintenance
designed to be simple
and done onshore
Designed to require
less capital up-front
therefore reducing
adoption barriers.
Wave farms can start
small and scale
incrementally.
*The planned pre-commercial demonstration wave
farm is targeting testing to verify these design features
and benefits
August 15
14
Simple* to Manufacture, Deploy and Maintain
Manufacture components
1
Pack in sea containers
2
Transport – road, rail or sea
3
Assemble array in harbour
4
Tow array out to deployment site
5
Deploy devices in ocean
6
Add arrays to create “Wave Farm”
7
Connection to shore
8
Maintain – tow array back to shore
9
*The planned pre-commercial demonstration wave farm is
targeting testing to verify these design features and benefits
August 15
15
Process to Deploy
ProteanTM WEC Value Chain Concept
August 15
16
Target Markets
Remote coastal communities
and islands
Industrials – i.e., ports, mining
and off-shore oil rigs
• World Resource Institute CAIT*
• Ports seeking ocean surge mitigation,
estimates there are over 60 small
Island Nations
• Pacific Islands and Indian Ocean
Islands
• Developed Islands (Utility, Military and
Governments)
• Remote Islands (Towns and Resorts)
• Developing Islands (Utility, Banks
Governments)
• Typically run on expensive diesel fuel at
breakwater protection, power and water
• There are 27** oil rigs off the coast of
California with most grid connected
back to the coast – ripe for repurposing
for alternative energy production
• Currently, there are more than 2,400***
production platforms, drilling rigs and
other facilities in the Gulf of Mexico that
could benefit from diesel displacement
by wave energy generators
~$1 per litre
Sources:
* World Resource Institute CAIT - http://cait.wri.org/
** www.oceansciencetrust.org/wp-content/uploads/2015/04/oil-and-gas-decommissioning.pdf
*** www.nrel.gov/
August 15
17
Island Nations Market Value Could Be Substantial
~60 small island
nations around the
world consume*
~31 billion
kilowatt-hours of
electricity*
The majority of
their power needs
are currently
supplied by diesel
generators
The average
electricity tariff paid
by consumers can
be well above that of
large centralised
utility prices charged
in developed
countries
Annual expenditure
on electricity for
these ~60 small
island nations
could be as high as
A$9.3 billion**
* Source: World Resource Institute CAIT: http://cait.wri.org/
** Calculated using a nominal 30 cents per kW-hr energy price
estimate
August 15
18
Why California?
The Perfect Storm
Increased
Renewable Energy
Mandates and
Historic Drought
Powerful
Political
Commitment
Searching for a
viable wave
energy converter
Strategic
Relationships
and Assets
Current law is 33% of
electricity from
renewables by 2020
increasing to 50% by
2030
Searching for viable
WEC system to supply
electricity & desalinated
water to population est.
to be 44 million by 2030
Hydro generation
scaled back
Governor Brown aims
to reduce petroleum
use by half by 2030*;
enacting legislation is in
process
Lt Governor Gavin
Newsom leading
advisor to Cal Poly’s
CalWave team
Established US Office
in California. Strong
relationships, reputation
and network with Cal
Poly MOU, DOE and
San Marino Venture
Group
Existing nuclear and
coal generation being
phased out
Strong commitment to
leverage ocean energy
resource
High power market
prices
Fossil fuels
aggressively phased
out
Severe ongoing “once
in a millennia” drought
• http://www.arb.ca.gov/newsrel/petroleum_reductions.pdf,
August 15
27 oil rigs off the coast
of California ripe for
repurposing for
alternative energy
production
Industrial coastal supply
chain and support
assets
http://gov.ca.gov/news.php?id=18828
19
Milestones and Technology Development Pathway
Development Phase
Plan and
implement pilot
project for testing
array and power
integration
Initial
R&D
2004–
2006
August 15
2006–
2007
1.5m scale
prototyping producing
Zero Emission
Energy tested off the
Coast of Perth WA
Demonstration
scale and
device
design
modelling
1.5m scale
prototype
designed
and built
Desktop
scale
successfully
tested
2007–
2008
Testing Phase
2008–
2009
2010–
2013
2014
Design
Complete
and
Fabrication
of test buoy
commenced
Workshop
testing
complete
and ocean
testing
commenced
Seek customer
agreements
30 WEC demonstration wave
farm build, deploy and test
San Marino
Venture
Group
engaged as
advisors in
the U.S
H1
2015
Pre
Commercialisation
Feasibility
study for first
commercial
deployment
Initial
ocean
testing of
single
WEC
complete
H2
2015
Q4
2015
H1/2
2016
20
Validation with Key Partnerships
U.S
• MOU with Cal Poly, California’s
Leading Polytechnic University
to facilitate joint applications for
funding opportunities offered by
the U.S Department of Energy
(DOE)
• Invited follow-on award application
submitted for US$1.5 million grant
• Objective to establish the national
wave testing center off the
California coast
Australia
• MOU with Yanchep Beach Joint
Venture to collaborate on
potential wave farm development
of up to 20 megawatts
• Development of Protean™ WEC
wave farm off the coast of Western
Australia to potentially supply the
community at Two Rocks
• California-based San Marino
Venture Group appointed to
support commercialisation of
the Protean™ WEC in the U.S
August 15
21
Targeted Next Steps
4
3
2
1
Build and install
30 x 1.5kW buoy
(45 kW) precommercial
demonstration
wave farm off
WA’s coast
Validate Protean™
as scalable
power/water
supply solution
Seek viable
commercial
partnerships
Process
underway
Identify and
secure additional
deployment sites
and customers
Process
underway
45kW precommercial
demonstration
wave farm
testing
Process
underway
August 15
22
Growth Strategy
Scale &
Commercialise
Complete an initial feasibility study based on results from the
pre-commercial demonstration wave farm and commission a
larger scale commercial Protean™ wave farm
Expand
Expand operations around Australia and globally by targeting
regional and remote islands, ports and coastal communities and
industry
Partner
Maximise penetration of the Protean™ WEC technology in
multiple market segments and geographies with strategic
alliance partners:
• Cal Poly*
• Yanchep Beach Joint Venture (land developers)
• Microgrid design and deployment partners
• Ports
• Government and military
• Oil companies
• Power industry companies
* California Polytechnic University At San Luis Obispo
August 15
23
Early Commercialisation Strategy - Business Models
Stage One
Stage Two
Design, Build, Deploy
Operate and Maintain
By funding deployments
up-front. the company will
then receive the income
generated from the energy
and water produced
Once the arrays are
established and
producing energy the
asset could be sold,
either to the customer or
an infrastructure fund
Sell power and water
Outcome
Prove technology in
commercial setting
Capital efficient
business model
Designed to scale fast
Ongoing maintenance &
support role
August 15
Licensing potential
24
Investment Proposition – Wave Energy Technology
• Renewable energy technology with unique IP − exclusive IP rights and international
patents based on over 10 years in development
• Significant market opportunity − wave energy industry estimated by The UK Carbon
Trust to be worth $50 billion by 2050
• Focused commercialisation strategy in large niche’s - initially targeting diesel
displacement for remote islands, coastal communities, ports and coastal industry
• Technology validation - through historical prototyping, independent reviews, testing
results. Leading U.S Wave Technology University, California Polytechnic (Cal Poly) has
selected Protean as part of a testing and evaluation program under the Stonehenge –
Cal Poly MOU
• Targeting sustainable energy production − aim is to provide a better way to convert
wave energy with significant cost saving potential for clients and users
• Strong leadership team - track record in wave energy, energy industry, electric and water
utilities, international business and corporate
August 15
25
Stonehenge Korea Ltd (50/50 JV Company)
August 15
26
50/50 Joint Venture (JV) in South Korea
• JV completed with Korean listed partner1 via 50% sale of Stonehenge’s Korean
subsidiary for $2.5m listed scrip and $300k in year 1 placements – JV self funded
• Significant resources upgrade potential by testing 36,000m of core held at
KIGAM2 – targeting much larger vanadium resource
• Aim to move vanadium/uranium project into feasibility stage
• Work to secure strategic partnerships with Korean customers
• Nuclear power industry
• Steel makers
• Vanadium redox battery manufacturers
1 KORID (Korea Resources Investment & Development Inc.)
2 Subject to approval from Korea Institute of Geoscience and Mineral Resources
August 15
27
South Korean Vanadium and Uranium Project
• Established Korean office/management
and 50% ownership of Korean JV
Company.
• Largest uranium resource in Korea with
67.0Mlbs grading 329ppm U3O8 at a
cut-off of 200ppm U3O8 (JORC [2004])
• Maiden vanadium resource of 17.3Mlbs
(95% indicated) grading 3,186ppm V2O5
at a cut-off of 2,000ppm V2O5
• Significant vanadium and uranium
exploration targets
• Significant potential upgrade of
vanadium and uranium resources
• Predicted low processing Opex due to
successful co-extraction of uranium and
vanadium
August 15
28
Contacts
Bruce Lane – Managing Director
T: + 61 8 9481 2276
Office Address
Level 3
89 St Georges Terrace
Perth 6000
Telephone: +61 8 9481 2277
Fax: +61 8 9481 2355
Korean Office Address
c/o Stonehenge Korea
15th Floor, Kyobo Building,
1 Jongno, Jongno-gu
Seoul 110-714, Korea
서울특별시 종로구 종로1 교보빌딩 15층
우편번호: 110-714
Postal address: PO Box 7631, Cloisters Square, Perth 6850
Email: admin@stonehengemetals.com.au
www.stonehengemetals.com.au | www.proteanwaveenergy.com.au
August 15
29
Appendix
Summary of Protean™ Acquisition Terms
• Option to acquire 100% of PEA now exercised:
− 60m SHE shares were issued at settlement of the Option
− 60m SHE shares to be issued at completion of acquisition
− 120m performance shares issued at completion of acquisition
− $500k to be spent by May 2016
August 15
31
How The Protean™ WEC is Designed to Work
• The buoy is transported to site as a packed unit & then rafted up
with other buoys before being towed out to the deployment site.
• Once at the deployment site the ballast tanks in the bottom
ballast section are filled with water and the ballast descends
to the sea floor – the buoy is then operational immediately
• The buoy moves in a predictable circular manner when waves pass;
• The counterweights move as the buoy moves, thereby
continuously lengthening and shortening the mooring cables
which, being hung over the pulleys, cause the pulleys to rotate;
• Shaft power‡ is created as the pulleys rotate. Each shaft converts the wave energy
directly into a useful form;
• The pulleys rotate in both directions and the oscillations are internally rectified.
• In the case of the initial pre-commercial demonstration wave farm the buoys will
generate compressed air which is consolidate at sea and brought to shore where it will
drive a pneumatic motor which in turn will drive a generator.
‡ Shaft power is one of the most elementary means of power transmission & is
easily integrated into a wide variety of commonly used generation means such
as hydraulic or electric systems
August 15
This image is a stylised representation of the Protean WEC & does not
accurately represent the actual equipment
32
Most WEC’s − Where is the Cost?
Indicative levelised cost of energy components for WECs in early commercial farms
ProteanTM targets
3 core cost saving opportunities
1. Operations and
maintenance
Grid connection
2. Structure construction
Station keeping
3. Installation
Power takeoff
From the Carbon Trust Report “Accelerating Marine Energy”
www.carbontrust.com/media/5675/ctc797.pdf
August 15
33
ProteanTM Intellectual Property
1st Patent family
2nd Patent family
3rd Patent family
Foundation IP
Extensions to the
Foundation IP
Additions to the
Foundation IP
• Converts energy
• Converts energy
• Diver-less
from 5 degrees
of freedom
Ability to self
adjust for tidal
variations
Novel Method
for tuning device
for max energy
output
Ability to tune to
waves to
optimise energy
collection
Establishes
novel tension
mooring system
to convert wave
energy
from 6 degrees
of freedom
Hydrodynamic
energy
conversion
technology
•
Prototype Tested 2008
•
•
Six degrees of freedom
1. Up-down (heave)
2. Back-and-forth (surge)
3. Side-to side (sway)
4. Yaw
5. Pitch
6. Roll
August 15
•
•
•
•
•
•
deployment &
retrieval
Integrated
transportation
No reengineering
required for
usage at any
depth
Integrated
seabed mooring
Automated
deployment &
retrieval
technology
34
ProteanTM and Wave Energy References
• Australian Government. “Clean Energy Future.” Renewable Energy 2011 www.cleanenergyfuture.gov.au (accessed
21/10/2011).
• Carbon Trust. http://www.carbontrust.co.uk.
• Danish Energy Association. “Danish Energy Supply 09 Statistical Survey.” Danish Energy Association. 24 August 2010.
http://www.danishenergyassociation.com (accessed October 20, 2011).
• EcoGeneration “Ocean power experts.” EcoGeneration Magazine, July/August 2010: http://ecogeneration.com.au.
• “Enhancing Australia's Economic Prosperity.” Australian Government Department of Resources, Energy and Tourism. 14
July 2011. www.ret.gov.au (accessed October 20, 2011).
• European Renewable Energy Council. “Renewable Energy Policy Review Denmark.” European Renewable Energy Council.
March 2009. www.erec.org (accessed October 20, 2011).
• Foreign Exchange.org.uk. http://www.foreignexchange.org.uk/fx-rates/conversion/150/DKK/AUD (accessed 20/10/2011).
• Hemmer, M A, and A D Griffin. “The Wave Energy Resources along Australia's Southern Margin.” Journal of Renewable and
Sustainable Energy 2, no. 043108 (2010): 2.
• Leare, David, and Miguel Estaban. “Climate Change & Renewable Energy from the Ocean & Tides: Calming the Sean of
Regulatory Uncertainty.” The International Journal of Marine and Coastal Law, 2009: 617-651.
• Milan, Dr Laurence. “Submissions to the Senate Joint Select Committee of Fuel and Energy.” Parliament of Australia Senate
Committees. Carnegie Corporation Ltd. August 2008. www.aph.gov.au (accessed 21/10/2011).
• “Paperwork”, Kozumel, Creative Commons, Flickr. http://www.flickr.com/photos/kozumel/2228603119/
• Renewable Energy Policy Network for the 21st Century. Renewables 2011 Global Status Report. Status Report, Milan:
REN21, 2011.
• Wells, Dr Nick, and Dr Mike Shaw. Review of Engineering and Specialist Support Requirement for the Ocean Energy Sector.
Review, RPS Group Plc.
• The US Energy Information Administration http://www.eia.gov/
• http://industry.gov.au/Office-of-the-Chief-Economist/Publications/Documents/aprea/20140703.pdf
August 15